SSAVE THE SOUTHWEST← Evidence Library
RESEARCH 05 — POWER & ENERGY

Build power and water as one system.

This page tests whether the Southwest could supply the energy required for new water while also adding capacity for communities, industry and future growth.

Research rule:Do not model desalination as a flat peak load by default. Separate total annual energy from peak demand and test how product-water storage changes the power-system requirement.
FACT 01
4,200 MWPalo Verde capacity
Supported

Arizona already has a major source of around-the-clock nuclear generation.

APS reports Palo Verde can produce about 4,200 MW and is pursuing license renewal that could extend the three units into the mid-2060s.

What it means

Existing firm generation provides a reference point for the scale of future power requirements.

What it does not prove

Palo Verde’s performance does not prove that three additional reactors should or will be built.

FACT 02
New nuclearunder active study
Supported

Arizona utilities are evaluating additional nuclear generation.

APS, SRP and TEP are jointly conducting a preliminary siting study. They state that no final build decision has been made and no reactor technology has been selected.

What it means

New nuclear is a real planning option that can be modeled alongside solar, storage and other resources.

What it does not prove

Exploration is not approval, and future cost, schedule, financing and technology remain open questions.

FACT 03
Store watershift electric load
Supported

Freshwater storage can help make desalination a flexible grid load.

Water does not have to be produced at the exact moment it is consumed. A system with adequate product-water storage can schedule more treatment and some pumping during favorable power periods and reduce those loads during peak grid hours.

Flexible-load concept

Produce more freshwater during favorable power periods → store finished water → reduce desalination and selected pumping during grid peaks → continue water delivery from storage.

What it means

The energy model should distinguish annual energy consumption from instantaneous peak demand.

What it does not prove

Flexible operation does not eliminate total energy use, and plant ramping, minimum flows, storage volume and water-quality constraints must be validated.

FACT 04
3.0–4.5kWh/m³ RO reference
Supported

Desalination at the project goal would be a major energy consumer even with load shifting.

NREL gives a reference seawater reverse-osmosis electricity range of about 3.0–4.5 kWh/m³. At the 3 MAF/year goal (about 2.68 billion gallons per day), that range corresponds to roughly 1.3–1.9 GW of average reverse-osmosis treatment load before long-distance pumping, conveyance and other auxiliary loads.

What it means

Energy supply, transmission and operating strategy must be designed together with the water system.

What it does not prove

The reference range is not a final project load and should not be treated as including conveyance or all auxiliary systems.

SOURCE LIBRARY

Verify the evidence yourself.

These links open the original publisher or technical source rather than a Save the Southwest summary.

Palo Verde license renewalAPSMarch 2026Open ↗
New nuclear explorationAPS / SRP / TEPJune 2026Open ↗
APS large-load planningAPS2026Open ↗
Seawater RO energy referenceNRELTechnical referenceOpen ↗
Water–electricity integrated resource managementU.S. Department of Energy2016Open ↗